TENNET

TenneT Hoogeveen – Beilen connection

In its capacity of Transmission System Operator and administrator of the national high-voltage grid, TenneT is in charge of the ‘highways’ of the Dutch electricity grid, which interconnects all regional grids and the European grid.

As an approved supplier for TenneT (for cable from 50 kV up to 380- kV) we received an order for the supply of cable and accessories, as well as supervision of the installation and  the jointing and testing for a 110 kV cable connection between Hoogeveen en Beilen (via GAVI).

This cable route  is part of the expansion projects in the North east part of the network.

The whole project will be realized with an underground XLPE type cable and is planned to be finalized in the summer of 2010.
 
Drums TenneTDrums TenneT