Van 23 tot en met 25 mei zal LGCE op de Anga Com aanwezig zijn op stand B55.
We informeren u daar graag over onze prachtige oplossingen op het gebied van Data, Telecom en Power.
Bezoek ons in hal 7 stand B55. U kunt uw gratis ticket verkrijgen door het contactformulier in te vullen, waarna u een voucher code per e-mail ontvangt.
From 23 to 25 May, LGCE will be present at Anga Com at booth B55.
We will be happy to inform you there about our solutions in the field of Data, Telecom and Power.
Visit us in hall 7 stand B55. You can get your free ticket by filling in the contact form, after which you will receive a voucher code by e-mail.
Van 23 tot en met 25 mei zal LGCE op de Anga Com aanwezig zijn op stand B55.
We informeren u daar graag over onze prachtige oplossingen op het gebied van Data, Telecom en Power.
Bezoek ons in hal 7 stand B55. U kunt uw gratis ticket verkrijgen door het contactformulier in te vullen, waarna u een voucher code per e-mail ontvangt.
From 23 to 25 May, LGCE will be present at Anga Com at booth B55.
We will be happy to inform you there about our solutions in the field of Data, Telecom and Power.
Visit us in hall 7 stand B55. You can get your free ticket by filling in the contact form, after which you will receive a voucher code by e-mail.
Due to the growing demand for transport capacity, in 2010 the 220 kV connection between Zwolle Hessenweg and Vierverlaten was upgraded.
A temporary high-voltage substation was installed near Wijster on the ETP industrial estate in order to be able to connect an incineration unit of the Attero waste incinerator in time. TenneT is now building a new permanent high-voltage substation
The 110 kV cables and accessories have been supplied by LGCE/LS at the time and now LGCE/LS is also involved in the construction of the new station.
We will supply 110 kV cables and accessories like terminations and joints. Our part of the project will commence in March and is scheduled to be finished mid-April. LS Cable and system will install the terminations and the joints and will also perform the HV test for commissioning.
Materials have arrived in the storage recently and are now ready for usage in the project.